Ilunion Fuengirola
Project Management and Interior Design Project of the integral reform of the hotel, for the second time.
- Client Ilunion Hotels
- Rooms 180
- Date 2018
- Location Málaga
- Weeks 4
- Investment 2M€
02
02about the project
Accessible design
We did a total redistribution. The reception, cafeteria and lounges have been joined with a brighter open-plan distribution integrated into the promenade. We designed and renovated the ground floor, the restaurant and its 180 rooms, with the hotel open, in 4 weeks.
As the Technical Department of Ilunion Hotels, we develop all the projects and carry out the Project Management of the renovation works and new construction of each hotel in the chain.